The Select the Cubes to Include in the Virtual Cube dialog
appears.
- Double-click the Sales cube, to select and
move it from the Available Cubes list to the Virtual Cubes
Include list.
- Double-click the Budget cube to add it to the
virtual cube, as well.
The dialog appears as shown below, after our selections.
Illustration 5: Select the Cubes to Include in the Virtual Cube
- Click Next.
- Select (by double-clicking) the Store Cost
(from the Sales cube) and the Amount (from the Budget
cube) measures.
The Select the
Measures for the Virtual Cube dialog appears as shown in Illustration 6,
with our selections appearing in the Selected Measures list.
Illustration 6: Our Measures Selections Appear
- Click the Store Cost measure once, then again
after it is selected, to enter the edit mode.
- Change the Store Cost measure name to Actual
Expense.
- Click the Amount measure once to select it.
- Press F2 as an alternative means of entering
the edit mode.
- Change the Amount measure name to Budget
Expense.
A unique name is
required for each measure within a virtual cube. Once we make our
modifications, the Select the Measures for the Virtual Cube dialog
appears as shown below.
Illustration 7: The Measures as Modified
- Click Next.
The Select the Dimensions for the Virtual Cube dialog
appears.
- Select the dimensions (from the Available Dimensions
list) by double-clicking each of the following:
-
Time
- Product
- Store
- Account
Selection can also be made by highlighting and clicking the single
arrow ">" to move the dimension to the Selected Dimensions
list.
The Select the Dimensions for the Virtual Cube dialog appears
as shown in Illustration 8, with our selections appearing in the Selected
Dimensions list.
Illustration 8: Our Dimensions Selections Appear
- Click Next.
Page 5: Processing a Virtual Cube