MSSQL Server Reporting Services: Master Chart Reports: Pie Charts in Reporting Services - Page 5

August 30, 2004

Locate the Pie Chart Item on the Blank Report

The process of building a chart report consists of dragging the chart item onto the Layout tab, and adjusting it, while setting properties as appropriate to meet the report specifications.

1.  Click the Layout tab to switch to the Layout view.

2.  Drag the report edges to comfortably fill the screen area.

3.  Select View --> Toolbox (as shown in Illustration 14), from the main menu to place the Toolbox within easy reach (if it already appears, simply disregard this step).


Illustration 14: Calling the Toolbox to View

The toolbox window should appear similar to that shown in Illustration 15. Mine is pinned to the upper left corner of the design environment, where I find it most convenient. This is, of course, subject to your own choices. (Note also that I dock my Fields and Server Explorer panes in this area to maximize design real estate, as an aside.)


Illustration 15: The Toolbox, Pinned to the Upper Left Corner of the Design Environment

4.  Click the Chart button (at the bottom of the Toolbox pane).

5.  Place the mouse cursor over the upper left corner of the report layout.

The cursor becomes a small chart icon in combination with crosshairs when held above the layout. This indicates that we can click to "anchor" the point, from which we wish to draw the box that the chart will inhabit.

6.  Starting in the upper left corner of the layout body, click, and then, holding the mouse button down, drag to create a box that covers the report layout.

The layout should have this box appearing at its perimeter.

7.  Release the mouse to drop the chart item.

The chart item appears, in its generic manifestation, as shown in Illustration 16. Because the chart is the only item we intend to place in the report, it should extend almost completely over the report layout.


Illustration 16: The Generic Chart Item Appears

NOTE: Should you accidentally "drop" the chart item in a manner that you wish to realign, you can simply move the item by clicking inside the chart, then pointing to the now shaded border, to drag it to a new location.

Clicking again on the border will also allow you to expand / contract the chart shape. (The nuances are easy to learn with a little practice.) Double-clicking the chart item will make the "drop regions," seen above, appear.

The chart item is now in place, and we are ready to specify its "pie" nature, as well as to populate it with the dataset that we have created.